I think it will be done.
The only way it won't be is if there is problems with the roof, pitch or a H&S issue.
They have made amazing progress in the last year and what is different is the doing many different projects simultaneously. It's staggering really.
With Wanda they didn't have to play away from home and started in 2013 with the piling and foundations didn't they?
This build has been amazing considering the restraints.
We won't have the final finish on them podium walkways and surrounding areas though.
Neither the hotels etc or the facilities outside the south stand. Maybe not even Paxton House.
But the stadium will be open and all that can be finished post season at a later date.
This was the 12th August 2016
Just over a year ago. We have just under a year left, plus maybe some away games on the trot start of next year. Should be done.
Ps most stadiums are not fully finished when opened. There is usually some aesthetic work, touching up done afterwards.
Look at Emirates frontage and entrance and The OS when they opened